IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3359 Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0002 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,185 $0 Implemented
SJ0002 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $424 $194 Implemented
SJ0002 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,741 $652 Implemented
SJ0002 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,772 $0 Implemented
SJ0002 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,309 $22,700 Implemented
SF0586 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,078 $22,361 Implemented
SF0586 # 08 Y:2022 08 2022 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $62,090 $317,631 Implemented
SF0586 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,736 $14,830 Implemented
SF0586 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,974 $4,260 Implemented
SF0586 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,916 $68,135 Implemented
SF0586 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,428 $26,487 Implemented
SF0586 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,868 $0 Implemented
SF0586 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,887 $0 Implemented
SF0527 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,577 $0 Implemented
SF0527 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $70 Implemented
SF0527 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,584 $27,496 Implemented
SF0426 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,979 $17,191 Implemented
LM0109 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $408 $586 Implemented
LM0109 # 07 Y:2006 07 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,917 $7,000 Implemented
LM0109 # 06 Y:2006 06 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,573 $120,000 Implemented
LM0109 # 03 Y:2006 03 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $13,210 $90,000 Implemented
LM0109 # 01 Y:2006 01 2006 USE POWER DURING OFF-PEAK PERIODS $65,901 $200,000 Implemented
LM0110 # 06 Y:2006 06 2006 $153,608 $23,700 Implemented
LM0110 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,799 $90,000 Implemented
LM0058 # 01 Y:2003 01 2003 ADD AREA LIGHTING SWITCHES $6,786 $7,274 Implemented