IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,613

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0660 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,610 $500 Implemented
CO0659 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,680 $25,960 Implemented
CO0659 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $500 Implemented
CO0659 # 05 Y:2012 05 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,570 $0 Implemented
CO0658 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,430 $850 Implemented
CO0658 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,660 $550 Implemented
CO0657 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $350 Implemented
CO0657 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $460 $0 Implemented
CO0654 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $8,050 $1,440 Implemented
CO0654 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,130 $1,990 Implemented
CO0654 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $570 $820 Implemented
CO0654 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,900 $17,990 Implemented
CO0653 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,630 $800 Implemented
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
CO0652 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $870 Implemented
CO0650 # 01 Y:2011 01 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,700 $1,000 Implemented
CO0650 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,390 $190 Implemented
CO0650 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $9,240 Implemented
CO0650 # 05 Y:2011 05 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $740 $1,470 Implemented
CO0647 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,490 $520 Implemented
CO0647 # 03 Y:2011 03 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $950 $600 Implemented
CO0646 # 03 Y:2011 03 2011 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,120 $10,000 Implemented
CO0646 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,340 $2,730 Implemented
CO0646 # 08 Y:2011 08 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $150 $40 Implemented
CO0645 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,890 $1,290 Implemented