IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0384 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,067 $1,067 Implemented
BD0384 # 06 Y:2011 06 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,941 $2,000 Implemented
BD0384 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,049 $5,100 Implemented
BD0384 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $45,984 Implemented
BD0384 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $50,720 $73,600 Implemented
IC0174 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,326 $4,485 Implemented
IC0174 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,663 $0 Implemented
BD0360 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,222 $1,000 Implemented
BD0360 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,208 $20,180 Implemented
BD0360 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,740 $2,700 Implemented
BD0357 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $600 $0 Implemented
BD0357 # 10 Y:2009 10 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,905 $0 Implemented
BD0357 # 08 Y:2009 08 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,111 $0 Implemented
BD0357 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,672 $1,000 Implemented
BD0357 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $389 $300 Implemented
IC0146 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $1,535 $3,688 Implemented
IC0146 # 11 Y:2008 11 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $679 $0 Implemented
IC0146 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $424 Implemented
IC0146 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $211 Implemented
IC0146 # 08 Y:2008 08 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $541 $0 Implemented
IC0146 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $729 Implemented
IC0146 # 02 Y:2008 02 2008 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,159 $0 Implemented
IC0146 # 03 Y:2008 03 2008 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $24,543 $208,785 Implemented
IC0131 # 17 Y:2007 17 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,723 $15,000 Implemented
IC0131 # 15 Y:2007 15 2007 MINIMIZE WATER USAGE $7,267 $15,000 Implemented