IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0150 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $357 $9 Implemented
IP0150 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $952 $0 Implemented
IP0142 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $728 Implemented
IP0142 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,597 $14,185 Implemented
IP0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $40 Implemented
IP0142 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $494 $0 Implemented
IC0236 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,924 $30,183 Implemented
IC0236 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,481 $0 Implemented
IC0236 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,626 $4,075 Implemented
IP0092 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $546 $31 Implemented
IP0092 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,211 $0 Implemented
IP0092 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $7,288 $0 Implemented
IP0092 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $876 $0 Implemented
IP0092 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $635 $42 Implemented
IP0092 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,898 $1,119 Implemented
IP0092 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112,756 $41,810 Implemented
UD0977 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,684 $6,500 Implemented
UD0977 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,960 $0 Implemented
UD0977 # 08 Y:2017 08 2017 ADD AREA LIGHTING SWITCHES $745 $0 Implemented
UD0977 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $16,048 $2,000 Implemented
UD0977 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,231 $0 Implemented
IC0195 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,782 $11,163 Implemented
IC0195 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,417 $5,650 Implemented
IC0195 # 06 Y:2017 06 2017 REPLACE BOILER $183,000 $30,000 Implemented
IP0084 # 11 Y:2017 11 2017 INSTALL OCCUPANCY SENSORS $3,393 $2,038 Implemented