IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

191

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0455 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $17,379 $2,419 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,294 $287,294 Implemented
NC0428 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $681 $100 Implemented
NC0428 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,540 $13,050 Implemented
NC0428 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $145,527 $450,915 Implemented
NC0428 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,910 $25 Implemented
NC0428 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $307 $750 Implemented
NC0409 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,415 $50 Implemented
NC0409 # 04 Y:2010 04 2010 USE MINIMUM STEAM OPERATING PRESSURE $204 $100 Implemented
NC0409 # 03 Y:2010 03 2010 DEVELOP A REPAIR/REPLACE POLICY $1,256 $2,538 Implemented
NC0409 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $269 $133 Implemented
NC0409 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $613 $100 Implemented
NC0409 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $969 $1,151 Implemented
NC0409 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $736 Implemented
NC0411 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,139 $5,000 Implemented
NC0411 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,708 $500 Implemented
NC0411 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $100 Implemented
NC0411 # 05 Y:2010 05 2010 USE POWER DURING OFF-PEAK PERIODS $400 $100 Implemented
NC0388 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $400 $10,000 Implemented
NC0388 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,091 $100 Implemented