IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

250

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0841 # 18 Y:2011 18 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,133 $2,098 Implemented
WV0427 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,867 $637 Implemented
WV0427 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,786 $1,000 Implemented
WV0427 # 06 Y:2011 06 2011 SHADE WINDOWS FROM SUMMER SUN $5,176 $81,597 Implemented
WV0427 # 09 Y:2011 09 2011 MODIFY STARTUP/SHUTDOWN TIMES $3,115 $975 Implemented
WV0427 # 10 Y:2011 10 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,890 $258 Implemented
UD0833 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $2,272 $300 Implemented
UD0833 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,467 $25 Implemented
UD0833 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,343 $500 Implemented
UD0833 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $844 $50 Implemented
UD0833 # 12 Y:2011 12 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $37,935 $100 Implemented
UD0833 # 15 Y:2011 15 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,435 $100 Implemented
UD0822 # 10 Y:2010 10 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,483 $63 Implemented
WV0409 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $2,838 Implemented
WV0409 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $3,087 $625 Implemented
WV0409 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $600 Implemented
WV0409 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,480 $0 Implemented
WV0409 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,292 $3,520 Implemented
UD0793 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $25,000 Implemented
UD0793 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,677 $1,000 Implemented
UD0793 # 04 Y:2009 04 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,855 $0 Implemented
UD0793 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,114 $0 Implemented
UD0793 # 07 Y:2009 07 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $1,000 Implemented
UD0793 # 08 Y:2009 08 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,460 $2,500 Implemented
UD0793 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $0 Implemented