IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

297

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0388 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,366 $3,122 Implemented
WV0388 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,801 $34 Implemented
UD0764 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $35,952 $98,336 Implemented
UD0764 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,818 $49,600 Implemented
UD0764 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,675 $1,275 Implemented
UD0764 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,230 $760 Implemented
UD0764 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,437 $0 Implemented
UD0754 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $135,639 $80,000 Implemented
UD0754 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,891 $305,325 Implemented
UD0754 # 04 Y:2007 04 2007 MINIMIZE WATER USAGE $17,430 $700 Implemented
UD0740 # 02 Y:2006 02 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $107,569 $256,000 Implemented
UD0740 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $56,879 $252,100 Implemented
UD0740 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $42,737 $0 Implemented
UD0740 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,352 $2,280 Implemented
UD0740 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $0 Implemented
UD0740 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,805 $1,500 Implemented
UD0740 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,326 $1,700 Implemented
UD0740 # 12 Y:2006 12 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,280 $0 Implemented
UD0740 # 13 Y:2006 13 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $223 $0 Implemented
UD0737 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $448,000 $-70,000 Implemented
UD0737 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $6,552 Implemented
UD0725 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,863 $28,350 Implemented
UD0725 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,772 $18,444 Implemented
UD0725 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $1,320 Implemented
UD0725 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,968 $0 Implemented