IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

297

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0725 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $1,788 $728 Implemented
UM0287 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,506 $675 Implemented
UM0287 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,467 $1,200 Implemented
UM0287 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,493 $8,770 Implemented
UM0287 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,726 $13,103 Implemented
UM0287 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,116 $1,000 Implemented
UM0287 # 08 Y:2005 08 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,334 $1,250 Implemented
UD0715 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,797 $53,464 Implemented
UD0715 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,402 $100 Implemented
UD0715 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,597 $500 Implemented
UD0715 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,021 $0 Implemented
UD0715 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $781 $340 Implemented
UD0715 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $531 $0 Implemented
UD0690 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,576 $7,366 Implemented
UD0690 # 04 Y:2004 04 2004 REDUCE FLUID FLOW RATES $4,171 $2,400 Implemented
UD0690 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,580 $0 Implemented
UD0690 # 11 Y:2004 11 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $352 $0 Implemented
UD0690 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $170 Implemented
UD0687 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,973 $1,000 Implemented
UD0687 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $2,430 $2,610 Implemented
UD0687 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $365 $450 Implemented
UD0687 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $15 Implemented
UD0682 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,790 $3,000 Implemented
UD0682 # 07 Y:2003 07 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $4,800 $2,000 Implemented
UD0682 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $1,000 Implemented