IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0585 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,658 $9,998 Implemented
UD0994 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $248,034 $337,264 Implemented
UD0967 # 03 Y:2017 03 2017 REPAIR OR REPLACE STEAM TRAPS $3,938 $7,676 Implemented
UD0967 # 02 Y:2017 02 2017 OPERATE BOILERS ON HIGH FIRE SETTING $5,894 $27 Implemented
UD0967 # 07 Y:2017 07 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $89,503 $0 Implemented
UD0967 # 08 Y:2017 08 2017 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $32,400 $4,662 Implemented
UD0967 # 14 Y:2017 14 2017 MINIMIZE WATER USAGE $13,765 $6,000 Implemented
UD0967 # 17 Y:2017 17 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,764 $0 Implemented
WV0532 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $806 $235 Implemented
WV0532 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $884 $158 Implemented
WV0532 # 06 Y:2016 06 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,845 $2,675 Implemented
WV0532 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,128 $0 Implemented
WV0532 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $811 $0 Implemented
WV0532 # 05 Y:2016 05 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,095 $730 Implemented
WV0532 # 13 Y:2016 13 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $25 Implemented
WV0532 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,284 $552 Implemented
WV0532 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $796 $795 Implemented
UD0943 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
UD0943 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,548 $2,400 Implemented
UD0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $0 Implemented
WV0505 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $1,699 $672 Implemented
WV0505 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,847 $345 Implemented
WV0505 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,063 $35 Implemented
WV0505 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,847 $1,000 Implemented
WV0505 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,601 $1,700 Implemented