IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0515 # 07 Y:1997 07 1997 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,789 $200 Implemented
UD0515 # 09 Y:1997 09 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,143 $150,000 Implemented
UD0511 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $21,000 Implemented
UD0511 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $4,700 Implemented
UD0511 # 03 Y:1997 03 1997 $28,000 $12,000 Implemented
UD0511 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,452 $20,000 Implemented
UD0511 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $52,379 $35,000 Implemented
UD0511 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $56,779 $70,000 Implemented
UD0511 # 08 Y:1997 08 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,802 $0 Implemented
UD0489 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,117 $15,000 Implemented
UD0489 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,445 $10,800 Implemented
UD0489 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $100 Implemented
UD0473 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,965 $8,000 Implemented
WV0036 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $10,433 Implemented
WV0036 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $298 $7,270 Implemented
WV0036 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $336 $620 Implemented
WV0036 # 08 Y:1994 08 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,377 $365 Implemented
WV0036 # 09 Y:1994 09 1994 USE SYNTHETIC LUBRICANT $1,265 $0 Implemented
UD0426 # 01 Y:1994 01 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $24,064 $500 Implemented
UD0426 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,565 $38,000 Implemented
UD0426 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,032 $400 Implemented
UD0426 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,752 $2,000 Implemented
UD0422 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $2,520 $8,000 Implemented
UD0422 # 02 Y:1994 02 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $20,950 $5,000 Implemented
UD0422 # 03 Y:1994 03 1994 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,812 $6,000 Implemented