Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0573 # 02 Y:1999 | 02 | 1999 | RECYCLE CASTING SAND | $159,120 | $310,000 | Implemented |
UD0573 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,523 | $14,669 | Implemented |
UD0564 # 02 Y:1999 | 02 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,972 | $148 | Implemented |
UD0564 # 04 Y:1999 | 04 | 1999 | COVER OPEN TANKS | $13,847 | $2,400 | Implemented |
UD0564 # 05 Y:1999 | 05 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $10,689 | $0 | Implemented |
UD0564 # 07 Y:1999 | 07 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,767 | $3,375 | Implemented |
UD0538 # 01 Y:1998 | 01 | 1998 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $211,528 | $50,000 | Implemented |
UD0538 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,771 | $5,737 | Implemented |
UD0515 # 01 Y:1997 | 01 | 1997 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $36,109 | $60,000 | Implemented |
UD0515 # 07 Y:1997 | 07 | 1997 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,789 | $200 | Implemented |
UD0515 # 09 Y:1997 | 09 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,143 | $150,000 | Implemented |
UD0511 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,757 | $21,000 | Implemented |
UD0511 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $885 | $4,700 | Implemented |
UD0511 # 03 Y:1997 | 03 | 1997 | $28,000 | $12,000 | Implemented | |
UD0511 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,452 | $20,000 | Implemented |
UD0511 # 05 Y:1997 | 05 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $52,379 | $35,000 | Implemented |
UD0511 # 06 Y:1997 | 06 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $56,779 | $70,000 | Implemented |
UD0511 # 08 Y:1997 | 08 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $9,802 | $0 | Implemented |
UD0473 # 01 Y:1995 | 01 | 1995 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,965 | $8,000 | Implemented |
UD0426 # 01 Y:1994 | 01 | 1994 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $24,064 | $500 | Implemented |
UD0426 # 02 Y:1994 | 02 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,565 | $38,000 | Implemented |
UD0426 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,032 | $400 | Implemented |
UD0426 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,752 | $2,000 | Implemented |
UD0403 # 01 Y:1993 | 01 | 1993 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $17,544 | $50,000 | Implemented |
UD0403 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,715 | $25,000 | Implemented |