IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0490 # 08 Y:2014 08 2014 REPLACE BOILER $1,367 $5,170 Implemented
UD0904 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,181 $0 Implemented
UD0904 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,875 $0 Implemented
UD0904 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $3,359 $450 Implemented
UD0904 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,024 $5,000 Implemented
UD0904 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,892 $0 Implemented
UD0904 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,236 $75,700 Implemented
UD0904 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $16,866 $20,982 Implemented
UD0904 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,786 $10,400 Implemented
UD0872 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $10,877 $5,000 Implemented
UD0872 # 02 Y:2013 02 2013 DEVELOP A REPAIR/REPLACE POLICY $17,313 $23,026 Implemented
UD0872 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $994 $0 Implemented
UD0872 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $33,247 $3,000 Implemented
UD0872 # 11 Y:2013 11 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $4,252 $2,000 Implemented
UD0872 # 13 Y:2013 13 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $538 $1,000 Implemented
UM0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,459 $84,630 Implemented
UD0835 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $25 Implemented
WV0408 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,874 $82 Implemented
WV0408 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,427 $0 Implemented
WV0408 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,953 $13,218 Implemented
WV0408 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,726 $316 Implemented
WV0408 # 09 Y:2010 09 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,520 $1,123 Implemented
WV0408 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,435 $1,900 Implemented
UD0813 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $944 $0 Implemented
UD0813 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,803 $0 Implemented