IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0388 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,117 $51,755 Implemented
WV0388 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $3,159 $1,876 Implemented
WV0388 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,130 $1,763 Implemented
WV0388 # 05 Y:2009 05 2009 DEVELOP A REPAIR/REPLACE POLICY $2,746 $560 Implemented
WV0388 # 06 Y:2009 06 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,424 $6,259 Implemented
WV0388 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,366 $3,122 Implemented
WV0388 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,801 $34 Implemented
UD0737 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $448,000 $-70,000 Implemented
UD0737 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $6,552 Implemented
UD0725 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,863 $28,350 Implemented
UD0725 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,772 $18,444 Implemented
UD0725 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $1,320 Implemented
UD0725 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,968 $0 Implemented
UD0725 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $1,788 $728 Implemented
UM0287 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,506 $675 Implemented
UM0287 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,467 $1,200 Implemented
UM0287 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,493 $8,770 Implemented
UM0287 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,726 $13,103 Implemented
UM0287 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,116 $1,000 Implemented
UM0287 # 08 Y:2005 08 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,334 $1,250 Implemented
UD0682 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,790 $3,000 Implemented
UD0682 # 07 Y:2003 07 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $4,800 $2,000 Implemented
UD0682 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $1,000 Implemented
UD0682 # 09 Y:2003 09 2003 $2,596 $0 Implemented
UD0680 # 01 Y:2003 01 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $24,031 $500 Implemented