IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

555

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0863 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $351 $0 Implemented
AM0863 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $640 $1,235 Implemented
TR0028 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $3,155 Implemented
TR0028 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $787 $1,511 Implemented
TR0028 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,584 $602 Implemented
AM0852 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $49,000 $68,400 Implemented
AM0852 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $420 $235 Implemented
AM0852 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,040 $1,835 Implemented
AM0852 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,500 Implemented
AM0840 # 10 Y:2022 10 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $86 $179 Implemented
AM0840 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,045 $17,675 Implemented
AM0840 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $50 Implemented
AM0840 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $1,000 Implemented
AM0825 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,860 $5,000 Implemented
AM0825 # 03 Y:2021 03 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $8,070 $4,250 Implemented
AM0817 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $8,520 Implemented
AM0817 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $10 Implemented
AM0805 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $2,130 $200 Implemented
AM0805 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $140 $15 Implemented
AM0805 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,150 $370 Implemented
AM0805 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $28,160 $575 Implemented
AM0805 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,400 $3,000 Implemented
AM0805 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,070 $820 Implemented
AM0805 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,210 $31,000 Implemented
AM0805 # 03 Y:2020 03 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $505 $0 Implemented