IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

564

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0191 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $4,613 Implemented
UU0191 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,303 $150 Implemented
UU0191 # 02 Y:2021 02 2021 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,428 $14,400 Implemented
UU0191 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,749 $38,000 Implemented
UU0189 # 06 Y:2021 06 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $403 $100 Implemented
UU0189 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,609 $100 Implemented
UU0189 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,084 $14,000 Implemented
UU0188 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $3,863 Implemented
UU0188 # 03 Y:2021 03 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,446 $14,800 Implemented
UU0188 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $83,964 $377,320 Implemented
UU0187 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $735 $1,470 Implemented
UU0186 # 06 Y:2021 06 2021 ADD AREA LIGHTING SWITCHES $398 $883 Implemented
UU0186 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,919 $19,705 Implemented
UU0186 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $822 $1,645 Implemented
UU0186 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $544 $200 Implemented
UU0185 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $255 Implemented
UU0185 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,525 $11,563 Implemented
UU0185 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,814 $14,000 Implemented
UU0185 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,198 $3,400 Implemented
UU0184 # 01 Y:2021 01 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $26,453 $92,586 Implemented
UU0182 # 01 Y:2021 01 2021 SELL COMBUSTIBLE WASTE $358,314 $840,585 Implemented
UU0182 # 02 Y:2021 02 2021 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $301,212 $427,040 Implemented
UU0182 # 06 Y:2021 06 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,360 $920 Implemented
UU0183 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,906 $22,506 Implemented
UU0183 # 05 Y:2021 05 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $19,111 $20,527 Implemented