IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0482 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,144 $1,000 Implemented
NC0501 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,685 $33,000 Implemented
NC0501 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $100 Implemented
NC0501 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $35,397 $25,000 Implemented
NC0501 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $1,630 Implemented
NC0501 # 07 Y:2013 07 2013 METER WASTE WATER $3,326 $4,200 Implemented
NC0468 # 12 Y:2012 12 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $34,749 $7,000 Implemented
NC0468 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $2,082 $2,100 Implemented
NC0468 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,026 $18,000 Implemented
NC0468 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,060 $800 Implemented
NC0423 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,736 $100 Implemented
NC0423 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,230 $4,585 Implemented
NC0423 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,209 $115,608 Implemented
NC0423 # 01 Y:2011 01 2011 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $1,468,749 $650,000 Implemented
NC0412 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,402 $1,200 Implemented
NC0412 # 05 Y:2010 05 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $7,153 $15,100 Implemented
NC0412 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $2,841 $4,995 Implemented
NC0412 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,233 $100 Implemented
NC0412 # 02 Y:2010 02 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $25,289 $50 Implemented
NC0412 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140,256 $442,314 Implemented
NC0399 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $4,744 $1,550 Implemented
NC0399 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $0 Implemented
NC0399 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $1,429 $5,438 Implemented
NC0399 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $200 Implemented
NC0399 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,597 $100 Implemented