IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0348 # 03 Y:1999 03 1999 USE AUTOMATIC CLEANING EQUIPMENT $3,765 $800 Implemented
OR0329 # 02 Y:1998 02 1998 $1,950 $1,140 Implemented
OR0320 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,078 $7,300 Implemented
OR0320 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,009 $9,609 Implemented
OR0320 # 06 Y:1998 06 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,785 $0 Implemented
OR0318 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $12,200 $2,450 Implemented
OR0318 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,184 $16,818 Implemented
OR0316 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $1,044 $6,400 Implemented
OR0316 # 07 Y:1998 07 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,142 $4,167 Implemented
OR0316 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $813 $0 Implemented
OR0316 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,410 $0 Implemented
OR0310 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $670 Implemented
OR0310 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $2,500 Implemented
OR0310 # 01 Y:1997 01 1997 USE PLASTIC PALLETS INSTEAD OF WOOD $11,530 $1,830 Implemented
OR0256 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $6,630 Implemented
OR0256 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,446 $560 Implemented
OR0256 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $830 $2,626 Implemented
OR0256 # 06 Y:1996 06 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,660 $16,440 Implemented
OR0250 # 01 Y:1995 01 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,311 $2,000 Implemented
OR0250 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $365 $2,985 Implemented
OR0205 # 07 Y:1994 07 1994 REDUCE SCRAP PRODUCTION $7,200 $16,420 Implemented
OR0205 # 06 Y:1994 06 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $845 $0 Implemented
OR0205 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $6,475 Implemented
OR0205 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,085 $3,659 Implemented
OR0205 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $2,000 Implemented