IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0673 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $0 Implemented
OR0588 # 01 Y:2012 01 2012 IMPROVE HANDLING PRACTICES $7,884 $60 Implemented
OR0588 # 02 Y:2012 02 2012 AVOID FROST FORMATION ON EVAPORATORS $8,968 $0 Not Implemented
OR0588 # 03 Y:2012 03 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,021 $10,000 Not Implemented
OR0588 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,053 $8,053 Implemented
OR0588 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $17,738 $17,500 Implemented
OR0588 # 06 Y:2012 06 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $631 $4,131 Not Implemented
UW0029 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,416 $120,000 Implemented
UW0029 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $3,269 $3,800 Implemented
UW0029 # 02 Y:2009 02 2009 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,263 $17,000 Implemented
UW0029 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,713 $9,934 Implemented
UW0010 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,340 $3,000 Not Implemented
UW0010 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,108 $4,160 Implemented
UW0010 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,398 $75,533 Not Implemented
UW0008 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,092 $700 Implemented
UW0008 # 01 Y:2007 01 2007 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $136,932 $492,147 Implemented
UW0008 # 05 Y:2007 05 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $231 $650 Not Implemented
UW0008 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,480 $11,244 Implemented
UW0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,830 $81,585 Implemented
OR0473 # 01 Y:2004 01 2004 $7,000 $7,000 Implemented
OR0473 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $1,500 Implemented
OR0473 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $7,400 $7,400 Not Implemented
OR0473 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $1,100 $4,000 Not Implemented
OR0473 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,530 $2,200 Implemented
OR0458 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $9,440 $7,400 Not Implemented