IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0032 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,065 $3,070 Implemented
UW0032 # 05 Y:2009 05 2009 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $297 $200 Implemented
UW0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,643 $10,000 Implemented
UW0032 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,782 $31,747 Implemented
UW0029 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,713 $9,934 Implemented
UW0029 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $3,269 $3,800 Implemented
UW0029 # 02 Y:2009 02 2009 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,263 $17,000 Implemented
UW0029 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,416 $120,000 Implemented
UW0028 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented
UW0028 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,942 $76,700 Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0026 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,522 $19,854 Implemented
UW0026 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $200 Implemented
UW0026 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,037 $0 Implemented
UW0026 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,086 $19,000 Implemented
UW0025 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $2,986 $6,091 Implemented
UW0025 # 03 Y:2009 03 2009 USE OPTIMUM TEMPERATURE $13,200 $19,800 Implemented
UW0024 # 05 Y:2009 05 2009 MINIMIZE WATER USAGE $3,573 $0 Implemented
UW0024 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $889 $0 Implemented
UW0024 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $0 Implemented
UW0024 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,517 $48,000 Implemented
UW0023 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,974 $120,000 Implemented