IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0128 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,391 $22,752 Implemented
WM0128 # 11 Y:2018 11 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $637 $740 Implemented
WM0128 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $1,744 $5,250 Implemented
WM0128 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,172 Implemented
WM0128 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,084 $0 Implemented
WM0128 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,118 $19,300 Implemented
WM0113 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,921 $18,856 Implemented
WM0068 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,592 $990 Implemented
WM0068 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,873 $2,860 Implemented
WM0068 # 09 Y:2015 09 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,440 $3,575 Implemented
WM0067 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,678 $0 Implemented
WM0067 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,495 $10,871 Implemented
WM0067 # 10 Y:2015 10 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,592 $640 Implemented
WM0067 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,586 $1,680 Implemented
WM0067 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,416 $0 Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented
WM0051 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,050 $225 Implemented
WM0051 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,648 $27,260 Implemented
WM0047 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,970 $0 Implemented
WM0047 # 01 Y:2014 01 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,205 $13,000 Implemented
WM0047 # 09 Y:2014 09 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,932 $2,100 Implemented
WM0047 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $1,180 Implemented
IA0518 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $149 $210 Implemented
IA0518 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,190 $8,793 Implemented
IA0518 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,434 $704 Implemented