IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,537

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0421 # 07 Y:2007 07 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $1,093 $1,800 Implemented
IA0421 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $4,080 Implemented
IA0421 # 06 Y:2007 06 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,749 $60 Implemented
IA0421 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $5,499 $675 Implemented
IA0421 # 08 Y:2007 08 2007 MINIMIZE WATER USAGE $10,056 $400 Implemented
IA0421 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $950 $2,575 Implemented
IA0421 # 05 Y:2007 05 2007 MODIFY STARTUP/SHUTDOWN TIMES $2,951 $500 Implemented
IA0419 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $758 $1,001 Implemented
IA0419 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,583 $3,300 Implemented
IA0419 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,450 $1,200 Implemented
IA0419 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $678 $25 Implemented
IA0419 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,055 $500 Implemented
IA0419 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,325 $800 Implemented
CO0609 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $300 Implemented
CO0609 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $161 $846 Implemented
TT0015 # 03 Y:2007 03 2007 REPAIR OR REPLACE STEAM TRAPS $2,000 $1,600 Implemented
LE0265 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,608 $860 Implemented
LE0265 # 06 Y:2007 06 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $594 $0 Implemented
LE0265 # 02 Y:2007 02 2007 INSTALL TIMERS AND/OR THERMOSTATS $10,266 $2,250 Implemented
LE0265 # 01 Y:2007 01 2007 $45,000 $7,800 Implemented
LE0265 # 05 Y:2007 05 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,558 $0 Implemented
DL0010 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,529 $450 Implemented
DL0010 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
GT0845 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $8,290 $4,750 Implemented
GT0845 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,215 $2,000 Implemented