IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,033

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0543 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,306 $2,116 Implemented
AS0543 # 02 Y:2023 02 2023 AIR CONDITION ONLY SPACE NECESSARY $1,804 $8,019 Implemented
AS0540 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $395 $1,341 Implemented
AS0540 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,767 $4,200 Implemented
AS0540 # 02 Y:2022 02 2022 PAY BILLS ON TIME TO AVOID LATE FEES $9,085 $21 Implemented
TR0034 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,468 $36,208 Implemented
TR0034 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,602 $2,500 Implemented
TR0036 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $755 Implemented
WM0191 # 02 Y:2023 02 2023 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,731 $32,670 Implemented
WM0191 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,985 $2,600 Implemented
WM0191 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $0 Implemented
WM0190 # 02 Y:2023 02 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,068 $525 Implemented
WM0190 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $236 $1,000 Implemented
DL0216 # 07 Y:2023 07 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,672 $0 Implemented
DL0216 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $12,154 $50,000 Implemented
DL0216 # 05 Y:2023 05 2023 BURN A LESS EXPENSIVE GRADE OF FUEL $48,610 $0 Implemented
DL0216 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $93,960 $250,000 Implemented
DL0216 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $124,500 $181,000 Implemented
TR0031 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $181 $0 Implemented
TR0031 # 05 Y:2022 05 2022 MAINTAIN MACHINES TO REDUCE LEAKS $1,263 $684 Implemented
TR0031 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $1,434 Implemented
TR0031 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $1,258 Implemented
IC0274 # 03 Y:2023 03 2023 USE POWER DURING OFF-PEAK PERIODS $24,024 $0 Implemented
IC0274 # 01 Y:2023 01 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $233 $359 Implemented
TR0035 # 03 Y:2022 03 2022 MAINTAIN MACHINES TO REDUCE LEAKS $659 $507 Implemented