IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0540 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,767 $4,200 Implemented
AS0540 # 02 Y:2022 02 2022 PAY BILLS ON TIME TO AVOID LATE FEES $9,085 $21 Implemented
AS0540 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $395 $1,341 Implemented
WV0634 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $214 $908 Implemented
WV0634 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $973 $1,500 Implemented
WV0634 # 04 Y:2022 04 2022 DEVELOP A REPAIR/REPLACE POLICY $1,166 $1,633 Implemented
WV0634 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $8,882 $8,985 Implemented
NL0073 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,537 $35,000 Implemented
NL0073 # 04 Y:2022 04 2022 USE OTHER WASTE CONCENTRATION METHODS $1,144 $1,258 Implemented
NL0073 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $772 $58 Implemented
NL0073 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,217 $225,000 Implemented
SF0590 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,777 $19,007 Implemented
SF0590 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,729 $89,990 Implemented
SF0590 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $61,064 $434,923 Implemented
SF0590 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $79,227 $13,234 Implemented
SF0589 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,854 $0 Implemented
SF0589 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,794 $15,591 Implemented
SF0589 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,635 $18,061 Implemented
SF0589 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,416 $292,043 Implemented
MA0843 # 04 Y:2022 04 2022 USE HEAT PUMP FOR SPACE CONDITIONING $7,677 $3,875 Implemented
MA0843 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $11,001 $6,450 Implemented
NL0068 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $5,394 Implemented
NL0068 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,339 $4,500 Implemented
NL0068 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,258 $7,000 Implemented
NL0068 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,011 $25,884 Implemented