Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
718
matching recommendationsNAICS | 3219 | Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0301 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,607 | $0 | Implemented |
TT0301 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,720 | $15,200 | Implemented |
OR0767 # 02 Y:2023 | 02 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $172,773 | $37,200 | Implemented |
OR0767 # 03 Y:2023 | 03 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $300,390 | $200,000 | Implemented |
UA0264 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,563 | $1,200 | Implemented |
UA0264 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,549 | $8,397 | Implemented |
UA0264 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,878 | $500 | Implemented |
UA0264 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,745 | $4,870 | Implemented |
WV0626 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,860 | $7,799 | Implemented |
WV0626 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,701 | $160 | Implemented |
WV0626 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $792 | $3,586 | Implemented |
WV0626 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $454 | $467 | Implemented |
WV0626 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $301 | $40 | Implemented |
WV0626 # 09 Y:2022 | 09 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $291 | $1,347 | Implemented |
AS0525 # 08 Y:2022 | 08 | 2022 | MAINTAIN MACHINES TO REDUCE LEAKS | $705 | $1,992 | Implemented |
AS0525 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,862 | $6,763 | Implemented |
AS0525 # 05 Y:2022 | 05 | 2022 | APPLY FOR INVESTMENT INCENTIVES | $17,475 | $500 | Implemented |
AS0525 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,910 | $12,950 | Implemented |
AS0525 # 03 Y:2022 | 03 | 2022 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $22,011 | $1,900 | Implemented |
AS0525 # 02 Y:2022 | 02 | 2022 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $32,935 | $15,560 | Implemented |
LE0525 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $763 | $2,001 | Implemented |
LE0525 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $150 | Implemented |
AS0519 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $352 | $830 | Implemented |
AS0519 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $3,455 | Implemented |
AS0519 # 05 Y:2022 | 05 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,322 | $7,738 | Implemented |