IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0567 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,615 $1,369 Implemented
MA0567 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $4,156 $6,867 Implemented
MA0567 # 04 Y:2004 04 2004 $8,762 $1,000 Implemented
MA0567 # 01 Y:2004 01 2004 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,900 $270,000 Implemented
MA0566 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $148,951 $35,885 Implemented
MA0566 # 02 Y:2004 02 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $113,441 $191,180 Implemented
MA0566 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,400 $20,000 Implemented
MA0566 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $5,889 $3,076 Implemented
UU0069 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,497 $268 Implemented
UU0069 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,560 $0 Implemented
UU0069 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,545 $2,000 Implemented
UU0069 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,879 $11,735 Implemented
MA0559 # 03 Y:2004 03 2004 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $36,905 $15,475 Implemented
MA0559 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $11,346 Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
LE0195 # 11 Y:2004 11 2004 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $960 $200 Implemented
LE0195 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,089 $0 Implemented
LE0195 # 10 Y:2004 10 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,299 $1,200 Implemented
LE0195 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,946 $48,000 Implemented
LE0195 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,095 $0 Implemented
LE0195 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $16,168 $6,683 Implemented
NC0289 # 01 Y:2004 01 2004 RECYCLE WASTE INK AND CLEANUP SOLVENT $21,873 $25,000 Implemented
LE0191 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $4,530 $750 Implemented