Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

363

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0523 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,925 $1,308 Implemented
UF0523 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,991 $4,959 Implemented
UF0523 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $14,533 $1,600 Implemented
OK1002 # 06 Y:2019 06 2019 INSTALL SET-BACK TIMERS $1,083 $802 Implemented
OK1002 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,768 $3,646 Implemented
OK1002 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,400 $2,933 Implemented
OK1002 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,343 $2,609 Implemented
OK1001 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $3,509 Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
OR0713 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,594 $4,336 Implemented
OR0713 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,959 $10,959 Implemented
OR0703 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,797 $13,333 Implemented
OR0703 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,525 $8,125 Implemented
OR0703 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $4,730 Implemented
MA0785 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,893 $20,000 Implemented
MA0785 # 03 Y:2017 03 2017 KEEP BOILER TUBES CLEAN $1,014 $1,200 Implemented
SF0505 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $3,828 $5,423 Implemented
SF0505 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $1,069 $1,882 Implemented
OR0680 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,732 $3,529 Implemented
OR0680 # 03 Y:2017 03 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000 Implemented
OR0680 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392 Implemented
LE0408 # 06 Y:2016 06 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,005 $4,800 Implemented
LE0408 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $34,913 $25 Implemented