Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2311 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,819 | $13,218 | Implemented |
UL2311 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,230 | $1,980 | Implemented |
UL2311 # 03 Y:2023 | 03 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,286 | $1,600 | Implemented |
UL2311 # 07 Y:2023 | 07 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $3,418 | $1,000 | Implemented |
UL2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,408 | $2,832 | Implemented |
UL2304 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,246 | $1,300 | Implemented |
UL2304 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,568 | $26,328 | Implemented |
UK1613 # 10 Y:2017 | 10 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $145 | $0 | Implemented |
UK1613 # 09 Y:2017 | 09 | 2017 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $478 | $756 | Implemented |
UK1613 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $535 | $0 | Implemented |
UK1613 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $0 | Implemented |
UK1613 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,264 | $1,200 | Implemented |
UK1613 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,671 | $0 | Implemented |
UK1603 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,948 | $0 | Implemented |
UK1603 # 10 Y:2016 | 10 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,457 | $0 | Implemented |
UK1603 # 09 Y:2016 | 09 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $33,165 | $58,682 | Implemented |
UK1603 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,304 | $1,600 | Implemented |
UK1603 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,160 | $14,700 | Implemented |
UK1603 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,272 | $35,000 | Implemented |
UK1603 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89,730 | $85,358 | Implemented |
UK1317 # 06 Y:2013 | 06 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,200 | $1,900 | Implemented |
UK1317 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,706 | $17,700 | Implemented |
UK1317 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $139,142 | $342,000 | Implemented |
UD0873 # 07 Y:2013 | 07 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $1,809 | $0 | Implemented |
UD0873 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,732 | $9,904 | Implemented |