IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0456 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $100 Implemented
NC0456 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $34,238 $5,500 Implemented
TT0092 # 08 Y:2012 08 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,500 $9,600 Implemented
TT0092 # 01 Y:2012 01 2012 REPAIR OR REPLACE STEAM TRAPS $18,416 $2,040 Implemented
TT0092 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,171 $3,000 Implemented
WV0450 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented
MI0222 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,910 $2,520 Implemented
MI0222 # 08 Y:2012 08 2012 INSTALL SKYLIGHTS $2,227 $960 Implemented
MI0222 # 07 Y:2012 07 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,893 $80 Implemented
MI0222 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,363 $1,660 Implemented
WV0447 # 10 Y:2012 10 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,330 $0 Implemented
WV0447 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $7,871 $1,608 Implemented
WV0447 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $19,009 $1,000 Implemented
WV0447 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,067 $17,569 Implemented
UMS007 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $480,000 $800,000 Implemented
MI0218 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,118 $2,520 Implemented
MI0218 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,901 $1,660 Implemented
MI0218 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,055 $80 Implemented
DL0082 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $1,330 Implemented
DL0082 # 04 Y:2012 04 2012 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $716 $90 Implemented