Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsNAICS | 325414 | Biological Product (except Diagnostic) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0461 # 03 Y:2013 | 03 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $40,724 | $0 | Implemented |
WV0461 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,595 | $800 | Implemented |
WV0461 # 04 Y:2013 | 04 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $14,386 | $31,000 | Implemented |
DL0062 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,000 | $5,000 | Implemented |
DL0062 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,900 | $30 | Implemented |
SU0300 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,801 | $1,925 | Implemented |
SU0300 # 01 Y:2010 | 01 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $64,500 | $3,122 | Implemented |
SD0413 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $31,920 | $13,200 | Implemented |
SD0413 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Implemented |
SD0413 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Implemented |
SD0413 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,623 | $13,300 | Implemented |
SD0413 # 07 Y:2009 | 07 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,800 | $2,000 | Implemented |
SD0413 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,905 | $13,511 | Implemented |
SD0413 # 02 Y:2009 | 02 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $57,036 | $120,000 | Implemented |
IA0411 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,897 | $28,132 | Implemented |
IA0411 # 08 Y:2007 | 08 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,675 | $33 | Implemented |
UU0074 # 06 Y:2004 | 06 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,570 | $12 | Implemented |
WI0459 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $640 | Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
MA0528 # 04 Y:2003 | 04 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,752 | $0 | Implemented |
MA0528 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $2,103 | $1,325 | Implemented |
AM0431 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,150 | $0 | Implemented |
AM0431 # 07 Y:2003 | 07 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $750 | $0 | Implemented |
AM0431 # 04 Y:2003 | 04 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,100 | $0 | Implemented |