IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1027 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,013 $65,250 Implemented
UD1027 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $1,000 Implemented
UD1027 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,612 $0 Implemented
WV0579 # 10 Y:2019 10 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $346 $33 Implemented
WV0579 # 09 Y:2019 09 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $589 $1,000 Implemented
WV0579 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $4,488 $879 Implemented
WV0579 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,379 $3,500 Implemented
WV0521 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $728 $443 Implemented
WV0521 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,142 $152 Implemented
WV0521 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $718 $500 Implemented
WV0521 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $10,186 $8,000 Implemented
UD0898 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $50 Implemented
UD0898 # 04 Y:2014 04 2014 COVER OPEN TANKS $57 $200 Implemented
UD0898 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $621 $20 Implemented
UD0898 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $309 $0 Implemented
UD0886 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $341 $0 Implemented
UD0886 # 14 Y:2013 14 2013 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $2,995 $0 Implemented
UD0886 # 12 Y:2013 12 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,648 $6,720 Implemented
UD0886 # 07 Y:2013 07 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $36,728 $14,900 Implemented
WV0416 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,776 $1,360 Implemented
WV0416 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,496 $2,500 Implemented
WV0416 # 07 Y:2010 07 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,558 $1,000 Implemented
WV0416 # 08 Y:2010 08 2010 DEVELOP A REPAIR/REPLACE POLICY $3,797 $830 Implemented
WV0276 # 07 Y:2003 07 2003 REPAIR OR REPLACE STEAM TRAPS $2,328 $480 Implemented
WV0276 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,737 $16,926 Implemented