IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0093 # 03 Y:2012 03 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,625 $52,000 Implemented
TT0093 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,350 $800 Implemented
TT0093 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,014 $7,685 Implemented
MI0224 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,266 $11,960 Implemented
MI0224 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,947 $12,324 Implemented
MI0224 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,323 $3,480 Implemented
MI0224 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,660 Implemented
MI0224 # 06 Y:2012 06 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $996 $2,594 Implemented
MI0224 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $1,962 $520 Implemented
MI0224 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,668 $80 Implemented
MI0224 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $1,230 Implemented
UM0403 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,740 $6,369 Implemented
BD0414 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,204 $4,750 Implemented
UM0401 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,019 $5,000 Implemented
UM0401 # 04 Y:2012 04 2012 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,066 $448 Implemented
DL0087 # 01 Y:2012 01 2012 KEEP EQUIPMENT CLEAN $378,860 $370,000 Implemented
DL0087 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $410,000 $1,200,000 Implemented
DL0087 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,000 $78,000 Implemented
DL0087 # 05 Y:2012 05 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,900 $14,000 Implemented
DL0087 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,200 $5,400 Implemented
UA0080 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,321 $480 Implemented
UA0080 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $981 $364 Implemented
UA0080 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $632 $270 Implemented
WV0445 # 04 Y:2012 04 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,469 $0 Implemented
WV0445 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,693 $40,964 Implemented