Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
95
matching recommendationsNAICS | 326150 | Urethane and Other Foam Product (except Polystyrene) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0108 # 09 Y:2013 | 09 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $119 | $32 | Implemented |
SD0467 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,612 | $500 | Implemented |
SD0467 # 05 Y:2013 | 05 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $2,867 | $200 | Implemented |
SD0467 # 06 Y:2013 | 06 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,309 | $200 | Implemented |
SD0467 # 08 Y:2013 | 08 | 2013 | USE PHOTOCELL CONTROLS | $1,846 | $2,628 | Implemented |
SD0467 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,483 | $12,710 | Implemented |
SD0467 # 01 Y:2013 | 01 | 2013 | REDUCE SCRAP PRODUCTION | $24,055 | $56,924 | Implemented |
SF0425 # 01 Y:2013 | 01 | 2013 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $6,713 | $0 | Implemented |
SF0425 # 02 Y:2013 | 02 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,421 | $7,471 | Implemented |
SF0425 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,808 | $7,235 | Implemented |
SF0425 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $3,416 | $13,849 | Implemented |
SF0425 # 08 Y:2013 | 08 | 2013 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $692 | $2,830 | Implemented |
NC0428 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $681 | $100 | Implemented |
NC0428 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $307 | $750 | Implemented |
NC0428 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,910 | $25 | Implemented |
NC0428 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $145,527 | $450,915 | Implemented |
NC0428 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72,294 | $287,294 | Implemented |
NC0428 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,540 | $13,050 | Implemented |
LE0308 # 05 Y:2010 | 05 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,842 | $6,180 | Implemented |
LE0308 # 02 Y:2010 | 02 | 2010 | REPLACE BOILER | $18,600 | $210,000 | Implemented |
LE0308 # 01 Y:2010 | 01 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $21,676 | $250 | Implemented |
TT0049 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,756 | $173,505 | Implemented |
UW0029 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,713 | $9,934 | Implemented |
UW0029 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $3,269 | $3,800 | Implemented |
UW0029 # 02 Y:2009 | 02 | 2009 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,263 | $17,000 | Implemented |