IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0544 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,646 $6,156 Implemented
MA0544 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $20 Implemented
MA0544 # 01 Y:2003 01 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,663 $2,000 Implemented
GT0770 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,380 $0 Implemented
GT0770 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $490 $0 Implemented
GT0770 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $6,626 $0 Implemented
GT0770 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $109 $287 Implemented
OK0674 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,662 $13,792 Implemented
LE0174 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,251 $200 Implemented
LE0174 # 09 Y:2003 09 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $656 $0 Implemented
LE0174 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $224 $80 Implemented
LE0174 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,746 $750 Implemented
LE0174 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $1,050 Implemented
LE0174 # 10 Y:2003 10 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $1,100 Implemented
LE0174 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,585 $0 Implemented
LE0174 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $16,235 $262 Implemented
LE0174 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,375 $48,722 Implemented
WI0455 # 01 Y:2003 01 2003 $17,710 $2,500 Implemented
SF0272 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $542 $0 Implemented
SF0272 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,205 $0 Implemented
WI0453 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,121 $1,280 Implemented
WI0453 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,041 $18,315 Implemented
NC0268 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $693 $500 Implemented
BD0243 # 17 Y:2003 17 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $49,200 $1,000 Implemented
BD0243 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,277 $2,030 Implemented