Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
275
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0471 # 10 Y:2015 | 10 | 2015 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $86,400 | $1,050 | Implemented |
BD0471 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,732 | $500 | Implemented |
MZ0205 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $969 | $400 | Implemented |
MZ0205 # 02 Y:2015 | 02 | 2015 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,559 | $0 | Implemented |
MZ0205 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,581 | $850 | Implemented |
MZ0205 # 04 Y:2015 | 04 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $397 | $0 | Implemented |
BD0469 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $761 | $455 | Implemented |
BD0469 # 11 Y:2015 | 11 | 2015 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $4,000 | $100 | Implemented |
MA0752 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,599 | $47,900 | Implemented |
MA0752 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,566 | $37,930 | Implemented |
DL0154 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,585 | $32,700 | Implemented |
DL0154 # 02 Y:2015 | 02 | 2015 | USE COMPRESSOR AIR FILTERS | $1,390 | $2,190 | Implemented |
DL0154 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,950 | $2,280 | Implemented |
BD0467 # 08 Y:2015 | 08 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $707 | $104 | Implemented |
BD0467 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,782 | $600 | Implemented |
BD0467 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $925 | $450 | Implemented |
BD0467 # 04 Y:2015 | 04 | 2015 | USE PHOTOCELL CONTROLS | $2,275 | $600 | Implemented |
IP0052 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,655 | $61 | Implemented |
IP0052 # 04 Y:2015 | 04 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $12,878 | $902 | Implemented |
IP0052 # 07 Y:2015 | 07 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $10,505 | $7,153 | Implemented |
IP0052 # 01 Y:2015 | 01 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,077 | $47 | Implemented |
IP0052 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $437 | $9 | Implemented |
IP0052 # 08 Y:2015 | 08 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $12,926 | $10,000 | Implemented |
LE0402 # 04 Y:2015 | 04 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,700 | $21,000 | Implemented |
LE0402 # 05 Y:2015 | 05 | 2015 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,557 | $4,800 | Implemented |