Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 332117 | Powder Metallurgy Part Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0560 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $21,635 | $819,000 | Implemented |
AS0560 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,025 | $75,360 | Implemented |
AS0560 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,759 | $9,900 | Implemented |
AS0560 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,728 | $659,540 | Implemented |
MU0008 # 03 Y:2022 | 03 | 2022 | USE OPTIMUM TEMPERATURE | $168 | $0 | Implemented |
MU0008 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,317 | $2,520 | Implemented |
SU0454 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,562 | $2,313 | Implemented |
SU0454 # 01 Y:2018 | 01 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,250 | $2,600 | Implemented |
SU0454 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $631 | $1,100 | Implemented |
SU0454 # 05 Y:2018 | 05 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $624 | $702 | Implemented |
SU0454 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $201 | $168 | Implemented |
SU0454 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $609 | $1,336 | Implemented |
IP0095 # 10 Y:2018 | 10 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,136 | $3,970 | Implemented |
IP0095 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $2,961 | $1,093 | Implemented |
IP0095 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,356 | $3,070 | Implemented |
IP0095 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,255 | $11,125 | Implemented |
IP0095 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,023 | $2,041 | Implemented |
IP0095 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,935 | $25 | Implemented |
MA0769 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,487 | $39,330 | Implemented |
WM0053 # 13 Y:2014 | 13 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $560 | $512 | Implemented |
WM0053 # 12 Y:2014 | 12 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,677 | $19,918 | Implemented |
WM0053 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,731 | $1,292 | Implemented |
WM0053 # 10 Y:2014 | 10 | 2014 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,892 | $0 | Implemented |
CO0681 # 03 Y:2014 | 03 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $175,400 | $229,810 | Implemented |
UD0823 # 08 Y:2010 | 08 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,268 | $25 | Implemented |