IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
NAICS 3322 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0401 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $200 Implemented
NC0401 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,947 $6,200 Implemented
NC0401 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $5,761 $3,750 Implemented
MA0651 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,340 $96,800 Implemented
MA0651 # 03 Y:2009 03 2009 REPLACE BOILER $10,080 $30,700 Implemented
MA0648 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $36,798 $150,000 Implemented
MA0648 # 07 Y:2009 07 2009 COVER OPEN TANKS $5,857 $1,924 Implemented
BD0356 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,486 $0 Implemented
BD0356 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,914 $300 Implemented
BD0356 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,494 $300 Implemented
BD0356 # 07 Y:2009 07 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,823 $43,280 Implemented
WV0374 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,144 $12,730 Implemented
WV0374 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,831 $2,213 Implemented
WV0374 # 03 Y:2008 03 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,994 $4,500 Implemented
WV0374 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $7,339 $1,076 Implemented
WV0374 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,079 $6,378 Implemented
WV0374 # 08 Y:2008 08 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,513 $315 Implemented
WV0373 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $581 $336 Implemented
LL0280 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,405 $1,880 Implemented
LL0280 # 02 Y:2007 02 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,024 $210 Implemented
LL0280 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $30 Implemented
WI0511 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $8,256 $850 Implemented
WI0511 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,167 $8,820 Implemented
WI0511 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,712 $0 Implemented
WI0511 # 05 Y:2006 05 2006 USE SYNTHETIC LUBRICANT $2,149 $0 Implemented