IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
NAICS 33221 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0356 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,914 $300 Implemented
BD0356 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,494 $300 Implemented
BD0356 # 07 Y:2009 07 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,823 $43,280 Implemented
WV0374 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,144 $12,730 Implemented
WV0374 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,831 $2,213 Implemented
WV0374 # 03 Y:2008 03 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,994 $4,500 Implemented
WV0374 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $7,339 $1,076 Implemented
WV0374 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,079 $6,378 Implemented
WV0374 # 08 Y:2008 08 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,513 $315 Implemented
WV0373 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $581 $336 Implemented
LL0280 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,405 $1,880 Implemented
LL0280 # 02 Y:2007 02 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,024 $210 Implemented
LL0280 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $30 Implemented
WI0511 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $8,256 $850 Implemented
WI0511 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,167 $8,820 Implemented
WI0511 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,712 $0 Implemented
WI0511 # 05 Y:2006 05 2006 USE SYNTHETIC LUBRICANT $2,149 $0 Implemented
WI0511 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $446 $0 Implemented
WI0511 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $640 Implemented
WI0511 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $283 $150 Implemented
WI0511 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $0 Implemented
UF0372 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $22,802 $2,143 Implemented
UF0372 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,373 $10,886 Implemented
UF0372 # 03 Y:2005 03 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,383 $0 Implemented
UF0372 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,223 $16,223 Implemented