Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
979
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0441 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,783 | $37,000 | Implemented |
LE0439 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,477 | $600 | Implemented |
LE0439 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,992 | $5,000 | Implemented |
LE0439 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,903 | $21,654 | Implemented |
TR0001 # 01 Y:2017 | 01 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,042 | $5,000 | Implemented |
TR0001 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,935 | $23,676 | Implemented |
TR0001 # 03 Y:2017 | 03 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $112 | $0 | Implemented |
TR0001 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $441 | $237 | Implemented |
TR0001 # 06 Y:2017 | 06 | 2017 | INSTALL REPLACEMENT DOORS | $9,766 | $5,000 | Implemented |
TR0001 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,442 | $2,500 | Implemented |
TR0001 # 08 Y:2017 | 08 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,422 | $6 | Implemented |
MA0773 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,580 | $14,050 | Implemented |
MA0773 # 03 Y:2017 | 03 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,593 | $10,625 | Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
SU0434 # 03 Y:2017 | 03 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,568 | $2,420 | Implemented |
SU0434 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $469 | $507 | Implemented |
AM0722 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $149,000 | $471,100 | Implemented |
AM0722 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,570 | $1,000 | Implemented |
AM0722 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,230 | $1,000 | Implemented |
AM0722 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,000 | $0 | Implemented |
AM0722 # 06 Y:2017 | 06 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $980 | $80 | Implemented |
AM0721 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,440 | $2,000 | Implemented |
AM0721 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,960 | $0 | Implemented |
AM0721 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,240 | $2,410 | Implemented |
AM0721 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,632 | $670 | Implemented |