IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

400

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0569 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $427 Implemented
WV0569 # 10 Y:2019 10 2019 DEVELOP A REPAIR/REPLACE POLICY $369 $521 Implemented
MA0794 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,216 $852 Implemented
MA0794 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,640 $121,500 Implemented
WV0565 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $77,310 $17,740 Implemented
WV0565 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $2,854 $533 Implemented
WV0565 # 05 Y:2018 05 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,441 $500 Implemented
WV0565 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $810 $1,600 Implemented
WV0565 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $40 Implemented
GT0902 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $50 $197 Implemented
MZ0234 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,800 $0 Implemented
MZ0234 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,354 $1,550 Implemented
MZ0234 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,361 $50 Implemented
MZ0234 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $407 $2,000 Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented
IP0067 # 14 Y:2016 14 2016 INSULATE BARE EQUIPMENT $40 $167 Implemented
IP0067 # 12 Y:2016 12 2016 APPLY FOR INVESTMENT INCENTIVES $4,112 $10,000 Implemented
IP0067 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,374 $3,150 Implemented
IP0067 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,858 $765 Implemented
IP0067 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $9,360 $3 Implemented
IP0067 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $996 $0 Implemented
WV0527 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,539 $1,100 Implemented
WV0527 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,268 $2,530 Implemented