IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0045 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $0 Implemented
IP0045 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $25,783 $1,054 Implemented
IP0045 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $417 Implemented
IP0045 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,201 $17,250 Implemented
NC0548 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $1,904 $4,258 Implemented
NC0548 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $708 $100 Implemented
NC0548 # 05 Y:2015 05 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $6,019 $1,500 Implemented
NC0548 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,958 $6,100 Implemented
NC0548 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,585 $281 Implemented
BS0059 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,386 $9,729 Implemented
BS0059 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,254 $526 Implemented
BS0059 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $12,761 $18,045 Implemented
IA0536 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,942 $244 Implemented
IA0536 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $332 Implemented
IA0536 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,930 $2,873 Implemented
IA0536 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $6,563 Implemented
UD0932 # 01 Y:2015 01 2015 ISOLATE HOT OR COLD EQUIPMENT $99,668 $17,675 Implemented
UD0932 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $7,232 $933 Implemented
UD0932 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,373 $0 Implemented
TT0158 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $4,934 $7,361 Implemented
NC0542 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,576 $510 Implemented
NC0542 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209 $230 Implemented
NC0542 # 13 Y:2015 13 2015 INSTALL OCCUPANCY SENSORS $1,213 $500 Implemented
NC0542 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $8,373 Implemented
NC0542 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $3,000 Implemented