IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
NAICS 333111 Farm Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0631 # 03 Y:2023 03 2023 USE PHOTOCELL CONTROLS $754 $1,124 Implemented
AM0848 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $889 $1,568 Implemented
AM0848 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $149 $408 Implemented
AM0848 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $1,000 Implemented
LS2218 # 01 Y:2022 01 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $21,720 $0 Implemented
LS2218 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,196 $100 Implemented
LS2218 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $535 $90 Implemented
LS2218 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,287 $38,480 Implemented
UA0252 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $13,657 $8,080 Implemented
UA0252 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,634 $850 Implemented
UA0252 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $32,927 $257 Implemented
TT0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,143 $150 Implemented
TT0245 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,084 $1,500 Implemented
GT0924 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,833 $79,937 Implemented
GT0924 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $5,577 $13,969 Implemented
GT0924 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,068 $3,500 Implemented
MZ0265 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $1,406 Implemented
MZ0265 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,033 $4,192 Implemented
MZ0265 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $14,079 $20,625 Implemented
MZ0265 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,073 $1,940 Implemented
MZ0265 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,096 $10,000 Implemented
MZ0265 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,079 $2,052 Implemented
UA0183 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,373 $1,365 Implemented
UA0183 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $500 Implemented
UA0183 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,700 $31,835 Implemented