IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,806

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0457 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $560 $200 Implemented
SU0457 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $335 $430 Implemented
SU0457 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,156 $19,261 Implemented
SU0457 # 10 Y:2018 10 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $288 $1,051 Implemented
MA0787 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,589 $100 Implemented
MA0787 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,796 $100 Implemented
MA0787 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,111 $100 Implemented
MA0787 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $660 $100 Implemented
LS1802 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $379 $0 Implemented
LS1802 # 02 Y:2018 02 2018 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,300 $200 Implemented
LS1802 # 04 Y:2018 04 2018 USE PHOTOCELL CONTROLS $427 $400 Implemented
LS1802 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $159 $550 Implemented
OR0698 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,374 $9,440 Implemented
OR0698 # 03 Y:2018 03 2018 USE HEAT PUMP FOR SPACE CONDITIONING $12,461 $22,850 Implemented
OR0698 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,148 $325 Implemented
AM0742 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,300 $0 Implemented
AM0742 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $600 Implemented
AM0742 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $5 Implemented
UA0187 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,219 $6,260 Implemented
UA0187 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,032 $136,663 Implemented
UA0187 # 06 Y:2017 06 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $88,008 $0 Implemented
TT0200 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,558 $46,250 Implemented
TT0200 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,772 $1,000 Implemented
TR0005 # 01 Y:2017 01 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,452 $6,500 Implemented
TR0005 # 03 Y:2017 03 2017 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $258,000 $292,000 Implemented