Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0109 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,107 | $59 | Implemented |
IP0109 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,301 | $51,647 | Implemented |
IP0109 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,342 | $5,885 | Implemented |
IP0109 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,423 | $0 | Implemented |
BD0426 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,390 | $400 | Implemented |
BD0426 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,240 | $20 | Implemented |
BD0426 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,797 | $5,872 | Implemented |
BD0408 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,622 | $4,000 | Implemented |
BD0408 # 06 Y:2012 | 06 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $975 | $400 | Implemented |
BD0408 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $154 | $20 | Implemented |
BD0408 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,937 | $1,500 | Implemented |
BD0392 # 12 Y:2011 | 12 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $12,800 | $1,600 | Implemented |
BD0392 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $419 | $10 | Implemented |
BD0392 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,781 | $3,500 | Implemented |
BD0392 # 03 Y:2011 | 03 | 2011 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $6,856 | $55,000 | Implemented |
BD0390 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $434 | $237 | Implemented |
BD0390 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $272 | $500 | Implemented |
BD0390 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,595 | $4,000 | Implemented |
BD0390 # 02 Y:2011 | 02 | 2011 | INSTALL TURBULATORS | $2,436 | $2,500 | Implemented |
BD0390 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,012 | $21,240 | Implemented |
BD0378 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $9,404 | $12,450 | Implemented |
BD0360 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,740 | $2,700 | Implemented |
BD0360 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,208 | $20,180 | Implemented |
BD0360 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,222 | $1,000 | Implemented |
IC0146 # 02 Y:2008 | 02 | 2008 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,159 | $0 | Implemented |