IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

576

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0102 # 04 Y:1996 04 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,100 $700 Implemented
NC0102 # 06 Y:1996 06 1996 USE OTHER WASTE CONCENTRATION METHODS $3,239 $5,000 Implemented
OR0279 # 01 Y:1996 01 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,604 $0 Implemented
OR0279 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,754 $750 Implemented
OR0279 # 05 Y:1996 05 1996 KEEP BOILER TUBES CLEAN $1,349 $1,500 Implemented
AS0190 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,769 $100 Implemented
AS0190 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,298 $440 Implemented
AS0190 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $2,310 $2,025 Implemented
AS0190 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,913 $5,700 Implemented
AS0190 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $190,648 $100,000 Implemented
AS0190 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $10,501 $200 Implemented
DS0067 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $444 $4,230 Implemented
DS0067 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $9,685 $6,735 Implemented
DS0067 # 05 Y:1996 05 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,027 $2,390 Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented
UF0161 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $6,951 Implemented
UF0161 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,132 $1,000 Implemented
UF0161 # 07 Y:1996 07 1996 $11,375 $7,000 Implemented
DS0065 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $616 $11,156 Implemented
DS0065 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,358 $9,190 Implemented
DS0065 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $3,067 $683 Implemented
AM0281 # 01 Y:1996 01 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $95,600 $1,500 Implemented