IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,313

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
MZ0092 # 01 Y:2012 01 2012 REPAIR OR REPLACE STEAM TRAPS $14,965 $4,500 Implemented
MZ0092 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,594 $1,000 Implemented
MZ0092 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $6,999 $3,738 Implemented
MZ0092 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,516 $263 Implemented
MZ0092 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $567 $140 Implemented
OR0583 # 01 Y:2012 01 2012 AVOID FROST FORMATION ON EVAPORATORS $3,140 $2,412 Implemented
OR0583 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,663 $19,592 Implemented
OR0583 # 04 Y:2012 04 2012 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $6,078 $500 Implemented
OR0583 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,391 $3,854 Implemented
OR0583 # 06 Y:2012 06 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,779 $6,600 Implemented
MAS020 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,764 $7,000 Implemented
MAS020 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,667 $11,600 Implemented
MAS020 # 05 Y:2012 05 2012 REDUCE EXCESS STEAM BLEEDING $1,611 $500 Implemented
SF0407 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,965 $672 Implemented
SF0407 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,152 $672 Implemented
SF0407 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,437 $1,299 Implemented
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0404 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $257 $22 Implemented
SF0404 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $17,934 $5,426 Implemented
SF0404 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $697 $1,356 Implemented
SF0404 # 10 Y:2011 10 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $676 $1,569 Implemented
LL0356 # 01 Y:2011 01 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $35,965 $89,664 Implemented
LL0356 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $9,420 $840 Implemented
LL0356 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $6,412 $1,127 Implemented