IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,313

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0325 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,064 $1,000 Implemented
IA0325 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $53,817 $18,000 Implemented
IA0325 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $957 $245 Implemented
IA0325 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $25 Implemented
IA0325 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,473 $11,035 Implemented
IA0298 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $50 Implemented
IA0298 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $3,302 $2,062 Implemented
IA0298 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,683 $0 Implemented
IA0298 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $5,435 $850 Implemented
OR0414 # 03 Y:2002 03 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $6,650 $9,075 Implemented
OR0414 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $852 $0 Implemented
WV0246 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $0 Implemented
WV0246 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,539 $0 Implemented
WV0246 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,277 $240 Implemented
WV0246 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,200 $400 Implemented
WV0246 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $3,472 $2,563 Implemented
WV0246 # 10 Y:2002 10 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $458 $830 Implemented
WV0246 # 12 Y:2002 12 2002 PAY BILLS ON TIME TO AVOID LATE FEES $2,301 $0 Implemented
WV0244 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,136 $108 Implemented
WV0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,433 $900 Implemented
WV0244 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,318 $193 Implemented
WV0244 # 07 Y:2002 07 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,266 $4,270 Implemented
WV0244 # 08 Y:2002 08 2002 METER WASTE WATER $29,520 $944 Implemented
AS0328 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $4,422 Implemented
AS0328 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $675 Implemented