Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,938
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0742 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,465 | $11,685 | Implemented |
MA0742 # 08 Y:2015 | 08 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,024 | $11,650 | Implemented |
NC0521 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $364,896 | $1,350,000 | Implemented |
NC0521 # 03 Y:2014 | 03 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $57,030 | $40,000 | Implemented |
NC0521 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,043 | $5,100 | Implemented |
NC0521 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,870 | $102,717 | Implemented |
NC0521 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $2,313 | $650 | Implemented |
NC0521 # 09 Y:2014 | 09 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,162 | $4,256 | Implemented |
NC0513 # 01 Y:2014 | 01 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $137,290 | $454,945 | Implemented |
NC0513 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $89,082 | $860 | Implemented |
NC0513 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $21,458 | $10,000 | Implemented |
NC0513 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,428 | $100 | Implemented |
NC0513 # 05 Y:2014 | 05 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $325 | $175 | Implemented |
NC0513 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $3,462 | $3,470 | Implemented |
NC0513 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $835 | $240 | Implemented |
NC0513 # 11 Y:2014 | 11 | 2014 | KEEP BOILER TUBES CLEAN | $48,265 | $15,000 | Implemented |
NC0513 # 12 Y:2014 | 12 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $40,007 | $6,200 | Implemented |
NC0513 # 13 Y:2014 | 13 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $20,840 | $20,000 | Implemented |
NC0513 # 16 Y:2014 | 16 | 2014 | INSULATE FEEDWATER TANK | $438 | $257 | Implemented |
MA0729 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,490 | $500 | Implemented |
MA0729 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,956 | $3,300 | Implemented |
MA0729 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,173 | $200 | Implemented |
TT0127 # 04 Y:2014 | 04 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $600 | $25 | Implemented |
TT0127 # 05 Y:2014 | 05 | 2014 | DISCONNECT BALLASTS | $390 | $130 | Implemented |
NC0510 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $55,430 | $1,200 | Implemented |