Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0739 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,888 $0 Implemented
OR0628 # 07 Y:2014 07 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,718 $2,460 Implemented
OR0617 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,516 $13,850 Implemented
OR0617 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,848 $60,000 Implemented
OR0617 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $21,219 $131,114 Implemented
OR0617 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,239 $20,000 Implemented
OR0617 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $8,494 $35,187 Implemented
OR0617 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,455 $4,610 Implemented
OR0590 # 02 Y:2012 02 2012 USE OPTIMUM TEMPERATURE $3,137 $0 Implemented
OR0574 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,450 $7,166 Implemented
OR0562 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,192 $0 Implemented
OR0562 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,447 $2,724 Implemented
OR0562 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,447 $2,500 Implemented
OR0533 # 05 Y:2008 05 2008 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $8,300 $2,500 Implemented
OR0533 # 01 Y:2008 01 2008 REDUCE SCRAP PRODUCTION $34,537 $0 Implemented
OR0505 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,900 $0 Implemented
OR0505 # 08 Y:2006 08 2006 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $168,270 $185,000 Implemented
OR0505 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
OR0446 # 06 Y:2003 06 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,780 $26,000 Implemented
OR0446 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,100 $13,000 Implemented
OR0446 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,800 $21,600 Implemented
OR0446 # 02 Y:2003 02 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,000 $8,100 Implemented
OR0334 # 01 Y:1998 01 1998 $1,080,150 $1,000,000 Implemented
OR0334 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,250 $0 Implemented
OR0334 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,890 $0 Implemented