IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

428

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0165 # 05 Y:2000 05 2000 SELL USED PLATES TO AN ALUMINUM RECYCLER $1,863 $600 Implemented
BD0163 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,825 $20,000 Implemented
UM0156 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $428 $500 Implemented
UM0156 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $1,786 $0 Implemented
UM0156 # 05 Y:2000 05 2000 REPAIR OR REPLACE STEAM TRAPS $9,420 $880 Implemented
UM0156 # 06 Y:2000 06 2000 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,640 $6,500 Implemented
TN0635 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $39,020 $13,600 Implemented
TN0635 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $9,760 $3,580 Implemented
NC0143 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,467 $700 Implemented
UD0516 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,524 $8,150 Implemented
UD0516 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,205 $978 Implemented
UD0513 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $21,006 $25,000 Implemented
UD0513 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,283 $6,465 Implemented
UD0513 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,603 $19,910 Implemented
UD0513 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,228 $16,000 Implemented
UL0172 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $600 $9,340 Implemented
OD0072 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $200 Implemented
OD0072 # 02 Y:1996 02 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $7,269 $4,887 Implemented
GT0590 # 02 Y:1996 02 1996 REPAIR AND ELIMINATE STEAM LEAKS $30,732 $2,000 Implemented
GT0590 # 04 Y:1996 04 1996 ADJUST BURNERS FOR EFFICIENT OPERATION $40,100 $30,000 Implemented
GT0590 # 06 Y:1996 06 1996 REDUCE EXCESSIVE BOILER BLOWDOWN $18,987 $400 Implemented
GT0590 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $22,680 $2,500 Implemented
GT0590 # 09 Y:1996 09 1996 INCREASE AMOUNT OF CONDENSATE RETURNED $34,612 $31,200 Implemented
AR0080 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,133 $7,570 Implemented
AR0080 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,604 $364 Implemented