IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0277 # 09 Y:2001 09 2001 REPAIR AND ELIMINATE STEAM LEAKS $2,357 $2,400 Implemented
LM0019 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,000 $3,000 Implemented
NC0221 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $508 $455 Implemented
NC0221 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $44,663 $500 Implemented
NC0221 # 04 Y:2001 04 2001 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $3,060 $8,000 Implemented
NC0221 # 06 Y:2001 06 2001 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $47,842 $92,321 Implemented
UM0196 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $4,832 Implemented
UM0196 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $8,645 $19,064 Implemented
UM0196 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $450 Implemented
UM0196 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,496 $2,500 Implemented
UM0196 # 06 Y:2001 06 2001 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $46,825 $45,535 Implemented
LL0120 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $165,697 $5,304 Implemented
LL0120 # 02 Y:2001 02 2001 USE PHOTOCELL CONTROLS $8,053 $110 Implemented
TA0013 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,880 $70 Implemented
TA0013 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,300 $2,190 Implemented
TA0013 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $1,590 $130 Implemented
TA0013 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,130 $110 Implemented
TA0013 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $660 $85 Implemented
UD0634 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,762 $400 Implemented
UD0634 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,372 $0 Implemented
UD0634 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $132 Implemented
UD0634 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $600 Implemented
UD0633 # 01 Y:2001 01 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $25,095 $6,000 Implemented
UD0633 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,974 $3,000 Implemented